Construction Scheduling with Suretrak 3.0 - Dr. Mohamed Hegab - Livros - CreateSpace Independent Publishing Platf - 9781456433123 - 1 de fevereiro de 2011
Caso a capa e o título não sejam correspondentes, considere o título como correto

Construction Scheduling with Suretrak 3.0

Preço
€ 52,99

Item sob encomenda (no estoque do fornecedor)

Data prevista de entrega 23 de out - 6 de nov
Receba avisos sobre novos lançamentos de Dr. Mohamed Hegab
Adicione à sua lista de desejos do iMusic

Ainda não avaliado

The book covers the use of the SureTrak® software in easy format by walking through the software in a way similar to the practical use of the software which makes it easy to apply. It has project examples which allow user to grasp the concept and us the software efficiently. SureTrak® is planning and scheduling software that is trademarked and owned by Oracle that can be used in any industry including building, construction, oil & gas and software development.

Mídia Livros     Paperback Book   (Livro de capa flexível e brochura)
Lançado 1 de fevereiro de 2011
ISBN13 9781456433123
Editoras CreateSpace Independent Publishing Platf
Páginas 188
Dimensões 10 × 203 × 254 mm   ·   385 g
Idioma Inglês