Construction Delay Analysis Techniques: Technique Comparison, Float Analysis, and It Solution - Khalid S. Al-gahtani - Livros - LAP LAMBERT Academic Publishing - 9783843350709 - 13 de dezembro de 2010
Caso a capa e o título não sejam correspondentes, considere o título como correto

Construction Delay Analysis Techniques: Technique Comparison, Float Analysis, and It Solution

Preço
€ 66,99

Item sob encomenda (no estoque do fornecedor)

Data prevista de entrega 12 - 20 de nov
Presentes de Natal podem ser trocados até 31 de janeiro
Receba avisos sobre novos lançamentos de Khalid S. Al-gahtani
Adicione à sua lista de desejos do iMusic

Ainda não avaliado

At the present time, we do not have universally accepted method to precisely determine the construction project delays, their causes or responsibilities. The float ownership is another vague issue and deserves up front assignment, because it can affect the project time and risk as a result of float consumption by the owner and the contractor(s). The current Project Management (PM) software is used as a tool only to manage the project time, cost, and resources without the ability to determine the project delay, acceleration, or float consumption responsibilities that frequently cause the construction projects ending up in litigations. This Book has investigated the delay analysis techniques, and attempted to solve all of the identified weaknesses in analyzing the float ownership and consumption, acceleration impacts, and the effect of concurrent delays. In addition, it studies the current PM software in analyzing delay claim. Finally, a computer programming is introduced to use in analyzing delay claim. If you would like to understand and study the delay analysis techniques in depth, this is the right book to choose.

Mídia Livros     Paperback Book   (Livro de capa flexível e brochura)
Lançado 13 de dezembro de 2010
ISBN13 9783843350709
Editoras LAP LAMBERT Academic Publishing
Páginas 324
Dimensões 226 × 18 × 150 mm   ·   476 g
Idioma Inglês