Facility Integrated Contingency Planning: for Emergency Response and Planning - Thomas Socha - Livros - iUniverse - 9780595247813 - 17 de outubro de 2002
Caso a capa e o título não sejam correspondentes, considere o título como correto

Facility Integrated Contingency Planning: for Emergency Response and Planning

Preço
€ 21,49

Item sob encomenda (no estoque do fornecedor)

Data prevista de entrega 19 de out - 2 de nov
Receba avisos sobre novos lançamentos de Thomas Socha
Adicione à sua lista de desejos do iMusic

Ainda não avaliado

The Integrated Contingency Plan (ICP) will minimize duplication in the preparation and use of emergency response plans at the same facility and will improve economic efficiency for both the regulated and regulating communities. Facility expenditures for the preparation, maintenance, submission, and update of a single plan should be much lower than for multiple plans. The ICP format provided in this one-plan guidance is organized into three main sections: an introductory section, a core plan, and a series of supporting annexes.

Mídia Livros     Paperback Book   (Livro de capa flexível e brochura)
Lançado 17 de outubro de 2002
ISBN13 9780595247813
Editoras iUniverse
Páginas 262
Dimensões 150 × 15 × 225 mm   ·   390 g
Idioma Inglês  

Mais por Thomas Socha